Inside tip · Gold Coast
Since August 2026, the Gold Coast tram runs south to which suburb?
Answer: Burleigh Heads
Stage 3 added 6.7 km and 8 stations from Broadbeach South to Burleigh Heads, opening 9 August 2026.
Broadbeach South to Burleigh Heads takes around 16 to 17 minutes. Nearby Translink bus services will be reconfigured following the Stage 3 opening.
Learn about Oz, the fun way
Lap Queensland in The Big Lap, a free quiz game full of the inside secrets of Oz.
Play here